I've been due for an update here for quite a while. The dl-44 that's currently on the bench has taken an insane amount of time. It's very near to completion (don't want to say how near for fear of the voodoo taking over) and I should be moving right along the build log after that. I've gotten quite a few requests for builds, and as each client confirms the project, I'll add them to the list in the order that I'll be tackling them.
Obviously, after a 3 month build, I'm gonna need a break from big projects. So, I may jump around a little bit to some smaller projects before hitting another big one.
As most of you probably know, I'm a 3rd year Mechanical Engineering student, so school is taking up a lot of my time, and pretty much forcing me to build only on the weekends with larger projects, which cause things to get backed up. Things are going really well with school (for once) but it's still taking up most of my free time.
@Enaswede: the end is finally in sight. Expect a few emails throughout the day with more progress pics.
EDIT:
There has also been some confusion about the *customer supplied boards only* line in my services list. I'll think up a better way to word that when I get some time later on, but basically, if it's in stock at plecterlabs, I can order a CF for your build at cost. I've also been known to occasionally use a CF out of my personal stock for a build if the project that the CF was for wouldn't be built prior to a restock at plecterlabs.