First update relates to the MKVI:
I will indeed be doing a new "production run" of MKVI's in 2013. I am shooting for the end of the 1st Quarter or early in the 2nd Quarter. I will take up to 10 deposits for "standard" level MKVI builds before then. The non-refundable deposit is $100. If for some reason I do NOT end up producing the sabers, I will refund all deposits, however if you back out the deposit is forfeit. Sorry, but no selling of spots on these. Pricing should be similar to what is posted now, but materials cost and greeblie cost could affect it somewhat so I am not promising that it will be the EXACT same. A Crystal Shard version will also be available. Pricing has yet to be set. If you leave a deposit, you must specify which trim level you want at the time of deposit.
Those who wish to send a deposit should a) check my build log for space (remember, 10 slots for pre-sale only). b) post in this thread. c) send the $100 to ldm.tcss_services@yahoo.com with a note stating your forum name and trim level of the MKVI that you want.You may post questions here. Just know that at some point I will consolidate all of them into this post and delete the originals (so your post count may go down a scoche, lol).
Will these be available as a V2 option too? :)
Possibly. Pricing is not set though. I understand that I did indeed turn some of the original units into V2's so that will also likely happen agian.
Will you make me a v2 with a CF6 & CEX ????
If Not put me down for a PCv2 and when can i send you the $100
Possibly. I am not 100% sure that it will all fit. I will have to test it out when I have hilts in hand. Just know that the new group will be slightly redesigned for "ease of install" internally. You can send the $100 whenever you like. I will be listing the deposit paid list in my build log.
General,
If you are doing these, put me down for a MK VI, v3 with CS! Just let me know how to send you funds.
Respectfully,
Sanjuro
No problem Sanjuro. I will list those instructions above.