Posting this for acerocket
It's taken over a month of weekends, but I have completed both switch
bezel setups.
I will be moving on to the box brass 'button' next and then, what I
would consider the most time consuming part, the ears. After that, I
just need to take care of the grips, brass pins and circuit cards. It's
getting close, but the last two 'heavy' machining parts will also take a
handful of weekends to wrap up. I still have no idea when these will be
completed, so please don't PM/email and ask. I won't send the parts to
the parts needing anodize to the anodizer until all work is complete (so
I can test fit parts before finishing) and I have zero clue how long it
will take to get the grips molded and shipped. On top of that, there is
a lot of hand assembly to do on each saber. They are progressing and
the end is in sight. Just a little longer and they will be ready to ship.