I have not received any order info yet on the remaining 9, and frankly I'm tired of waiting. I offered to help DT out in this, but I assumed I would get all the info I need to get this moving in a timely manner.
Still waiting.
These are the options, I'm considering.
1.Packing the whole kit back up and sending it to AZ for US to assemble. They have all the info and parts needed. DT will just need to coordinate with them which ones he is building. I realize this would require opening lines of communication up, but THAT should have been done long ago. I should not have to be middleman in this
2.Completing the orders I have and sending them out, packing the remaining 9 kits back up and sending it to AZ for US to assemble. They have all the info and parts needed. DT will just need to coordinate with them which ones he is building. I realize this would require opening lines of communication up, but THAT should have been done long ago. I should not have to be middleman in this
3. Fronting the $$ myself for parts and build some basic units.
They will be setup with a swappable 4 AAA battery holder and 2 AA hold that will attach via velcro to the back of the speaker unit.
Main MLS units will not be assembled until orders arrive, but hopefully this will speed up the process.
in-hilt recharge will not be setup on any of these.
Exceptions
Darth Matth has a confirmed in-hilt NIMH setup
Orakaa wishes his to be sent to Gemini Concepts for assembly.
I would like to here your thoughts on this Overlord clients, so please chime in.