And my deposit will be on 1/27/11. $350 based on what I asked for correct?
only 150.00 is due by 01/31/11. The 157.00 is due when the hilts are complete, which I have no ETA on.
They will then go to the PC tech for outer finishing.
Those that are getting installs, can work out payment terms or plans once the hilts are in the installers hands.
My plan is still to take 2 like it was when this first came about. I have held off posting until I get paid, however, I will now show my intent. I get paid next week and will send the deposits in then.
Solan Starr - Hilt WHITE - P4 Blue - Empty
Solan Starr - Hilt BLACK - P4 Red - Empty
I would really like to have a PC install in each of these, but am unsure if I will have the $1400 soon enough. Is there any way to find out the expected finish date on these?
Sorry, I cannot provide dates. Grievous, MH and I are pretty flexible with payment plans. We only require that payment is complete before your saber ships to you.